View Single Post
 
Old 08-04-2011, 10:23 AM
FAST Fabrication FAST Fabrication is offline
Ford Rangers
 
Join Date: Jun 2010
Posts: 223
Default Re: Building a fiberglass center console with FAST Fabrication

Here is a supply list

Big jug of fiberglass resin. $35
1-2 bags of cloth $4.50 each
autobody mat, either get at autozone or you can get it all at walmart or buy on ebay for bigger quantity
2" throw away brushes, need a lot. To hard to try and clean after each mix $1
1 qt clear plastic cups .87 cents
Acetone
80 grit sand paper
1/4" wire mesh in outside section of home depot
1/2" mdf
3-black trash bags
roll of aluminum duck tape

the prices came from walmart, this is not the only way to do this. You can use foil instead of a 1.1 mil black trash bag for separation from frame. You can leave the frame inside depending on application. There are lots of ways to lay glass and building a positive or a negative are your options for the actual process you will follow.

Updates.

We did the final trim, basically laid it on our permanent fixture the tube and drew a line with marker and then used a cut off wheel to cut the shape.


cut our components and did some sanding




Here is a look at the top, its close still some work here and there


working on sides as we speak

----------

be careful when sanding if you start to see the strands from the mat, then you need to stop and buildup areas around it, if its to high
__________________
www.facebook.com/keithminnicksracing www.facebook.com/fast-fabrication
KMR thanks its sponsors FK Rod Ends, Yukon Gear & Axle, KMC Wheels, Lucas Oil, PRP Seats, Rigid Industries, McQueen Prototype Designs, Sway-A-Way Shocks, Primo Powder Coating, Dana Sniff Transmisions, JuanCo Performance Engineering, General Tire, JBA Headers, Fragola Performance Systems, Powermaster Alternators, Russler II

Last edited by FAST Fabrication; 08-04-2011 at 10:21 AM.
Reply With Quote