Quote:
Originally Posted by GSF1200S
I hear you. When i was installing in the ranger, it felt like forever getting it all installed. Between pulling seats, drilling, wiring, soldering, etc etc.. It took me about a week.
So awesome when its done though, you saved the labor costs, and you know its done right.
|
I'm going all out too. Putting a roof basket with LED light bar, running all new wiring for the speakers, probably about 60 square feet of sound deadening, new door speakers, 5 channel amp, sub, deck, etc.
And I've got a weeklong road trip/vacation right after. Gonna be a bitch